    About the Project

    • Expansion of the biogas plant and conversion to biomethane production
    • Increase of capacities from 12,000 tons to 30,000 tons of biodegradable waste
    • Unit for biomethane production and injection into the high-pressure gas pipeline
    • Implementation is planned for 06/2024
    • Potential biomethane production of 30 GWh/year

    Scope of Supply:

    • Unit for measurement, analysis, and injection into the high-pressure gas pipeline