HUTIRA – PLYN
plyn@hutira.cz
+420 541 212 144
  • Hutira
    Menu

    Reconstruction of a Regulation Station within 4 Hours

    At the beginning of November, the HUTIRA Slovakia s.r.o. Company carried out the reconstruction of the RS 100 1/1 – 440 (VTL RESO) station in Rakoluby residential area. The operation included both main line bypass and regulation line bypass. This solution was selected in order to ensure continuous supply of natural gas during maintenance/failure of the regulation line. Thanks to careful preparation phase at the workshop, the service technicians of HUTIRA Slovakia managed to resume the NG supply in just 4 hours.

    before

    installation

    after

    Your cookie settings

    We use cookies and similar technologies (collectively, "cookies") on this website. Detailed information on the use of cookies is provided Privacy Policy.

    If you agree to the use of all cookies (technical, analytical and advertising), click on the button below "I accept all". If you only want to accept or reject some cookies by category, click the button below "Detailed settings". You can change your cookie settings at any time.