2. 5. 2024
We solve, design and manufacture another interesting gas contract
For our major customer we design and manufacture high pressure control nodes to replace the existing ones that are no longer working. The specifics of the order consisted mainly in the design and implementation into an existing control station without the possibility of modifying the inlet and outlet piping.
Each assembly is fitted with proven distribution valves in a combination of BM5 quick disconnect valves and a BFL regulator, which includes a shut-off member. This combination ensures maximum reliability and operational safety.
The products are delivered with complete documentation, which includes all necessary tests (X-rays of the welds, pressure test with the participation of TIČR). Thanks to this, the customer can carry out the installation without the need for a shutdown.
We are proud of the quality of our products and provide our customers with only the highest standards, not only in the field of control technology.