HUTIRA – PLYN
plyn@hutira.cz
+420 541 212 144
  • Hutira
    Menu

    This time it was a solution to the problem of uncovering a high-pressure gas pipeline placed under a metro tube in Prague’s Černý Most. For space and situational reasons, it has become impossible to use standard excavators and dump trucks here. Therefore, a standard mini-excavator was used for the excavation work itself and a mobile suction dredger to transport the excavated soil. In 3 days, a record 336 m3 of soil was sucked out.

    HUTIRA
    HUTIRA