The mobile suction dredger (MSB) helped to uncover the high-pressure gas pipeline placed under the metro tube in Prague. – HUTIRA
This time it was a solution to the problem of uncovering a high-pressure gas pipeline placed under a metro tube in Prague’s Černý Most. For space and situational reasons, it has become impossible to use standard excavators and dump trucks here. Therefore, a standard mini-excavator was used for the excavation work itself and a mobile suction dredger to transport the excavated soil. In 3 days, a record 336 m3 of soil was sucked out.